Sign In | Join Free | My wpc-board.com |
|
Categories | Light Keel Roll Forming Machine |
---|---|
Model Number: | light steel keel |
Certification: | CE |
MOQ: | 1 set |
Payment Terms: | T/T, L/C |
Supply Ability: | 30 sets per month |
Delivery Time: | 45 days after receipt of buyer's deposit |
Packaging Details: | Packaging Details: 1. one 20ft container for loading one set machine with manual decoiler; 2. the whole Wiped Anti Rust Oil, PLC controller covered by foam film; 3. Spare parts and some small parts packed in plastic tooling box; 4. All Components Fixed |
Tile Type:: | Colored Glaze Steel |
Model Number:: | light keel roll forming machine |
Thickness:: | 0.3--0.8mm |
Dimension(L*W*H):: | 4.5m*1.2m*1.2m |
Roller material:: | 45# Forged Steel |
Power(W):: | 4+4KW |
Suitable to process:: | Color Steel Plate |
Control system:: | PLC Control |
Warranty:: | 12 Months |
Company Info. |
RFM Cold Rolling Forming Machinery |
Verified Supplier |
View Contact Details |
Product List |
T bar suspended ceiling grid making machine Ceiling Silliout T Runner
product Description
Gypsum Drywall Steell Stud & Track Roll Forming Machine/light steel keel frame stud and track cold forming machine Technical Parameter:
No.
main parameter of Gypsum Drywall Steell Stud & Track Roll Forming Machine/light steel keel frame stud and track cold forming machine
No. | main parameter of Gypsum Drywall Steell Stud & Track Roll Forming Machine/light steel keel frame stud and track cold forming machine | |
1 | Suitable to process | Color steel plate |
2 | Width of the plate | 20-300mm |
3 | Roller | 11 rollers |
4 | Dimensions | 5.6*1.15*1.51m |
5 | Power | 4+4kw |
6 | Thickness of the plate | 0.3-0.6mm |
7 | Productivity | 8-10m/min |
8 | Material of the cutting blade | Cr12 |
9 | Diameter of the roller | Φ70mm |
10 | Weight | About 2.3T |
11 | Voltage | 380V 50Hz 3phases |
14 | Control system | PLC control |
Note:Above parameters are standard,we can design and make some change according to your
requirement.
Our Services
Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment
Delivery Time
Within 30-45 days after receiving deposit
Installation and training:
a. If buyers visit our factory and check the machine, we will teach
you how to install and use the machine, and also train your
workers/technician face to face.
b. Without visiting, we will send you user manual and video to
teach you to install and operate.
c. If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things
1: How to play order:
Inquiry---confirm the profile drawings and price----confirm the
PI---arrange the deposit or L/C---then OK
2: How to visit our company:
Fly to Beijing airport:By high speed train From Beijing Nan to
Cangzhou Xi (1 hour),then we can pick up you.
![]() |