Sign In | Join Free | My wpc-board.com
wpc-board.com
Products
Search by Category
Home > Mining Machinery >

Cement Clinker 85TPH 110TPH Vertical Grinding Mill

Categories Vertical Grinding Mill
Brand Name: ZK
Model Number: ZKRM22.3
Certification: CE ISO Certification
Place of Origin: China
MOQ: 1 Set
Price: Negotiable
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 20 Set / Sets per Month
Delivery Time: 30 days
Packaging Details: Export standard container or as customers' requirements
Product Name: Vertical Grinding Mill Technical Process Simple /Long Service Life Vertical Raw Mill
Capacity: 1.5~110 (t/h)
Applicable materials: Clinker, Raw Meal etc
Color: Customized
Service: Design, Manufacturing, Sales
Spare Parts: Supply
Voltage: 220V/380V/440V
Business Scope: design, manufacturer, onsite guidance
Warranty: one year
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Cement Clinker 85TPH 110TPH Vertical Grinding Mill

Vertical Grinding Mill Technical Process Simple /Long Service Life Vertical Raw Mill


Vertical Raw Mill Introduction:
Vertical raw mill is widely accepted as the most efficient means of preparing most moist raw materials for the production of cement clinker. Vertical raw mill can prepare virtually any kiln feed material to your required fineness in an energy-efficient process – regardless of variations in grindability, drying requirements and abrasion. In fact, it can be adapted to a wide variety of specific requirements.


Parameter of Cement Vertical Mill:
ModelGrinding plate(mm)output(t/h)output(×10kt/a)Main motor power(kW)
diameterPitchblast furnace slagcementRaw mealblast furnace slagcementRaw meal
ZKRM08.212008001.5~23~46~81.535.555
ZKRM11.2150011003~45~610~1234.59110
ZKRM13.2170013008~911~1320~2269.517185
ZKRM15.2190015009~1014~1626~3481224250
ZKRM17.22100170012~1420~2340~50101736355
ZKRM19.22300190015~1724~2650~60132043.5450
ZKRM20.22400200018~2027~3060~751522.555560
ZKRM22.32600220023~2540~5085~1102035.577710

Remarks: the basic standard for vertical mill is as follow:

(1)Power consumption:slag≤25kWh/t,cement≤18kWh/t,raw meal≤9kWh/t;

(2)Moisture content:slag≤15%,cement≤3%,raw meal≤7%;

(3)Ffinished product fineness: specific surface area of slag 4200~4500cm²/g,specific surface area of cement 3300~380 cm²/g,raw meal fineness-80μmR 12~15%;

(4)Moisture content of refined powder:slag 0.5~1.0%,cement 0.5~1.0%,raw meal 0.5~1.0%;

(5)The specific installed capacity and parameters can be adjusted properly according to actual material nature.

(6)The above parameters are applicable for granular blast furnace slag, cement and raw meal and the model selection is determined by material property.


Vertical Raw Mill Working Principle:
The raw material from dosing station after weighing, transported into inlet of vertical mill by belt conveyor, then fed into rotary air lock of vertical mill with outer recycle materials, after the grinding, drying, separating, the crude material comes back grinding disc for grinding again, the qualified product will be brought into cyclone filter through separator, the product collected by cyclone filter and powder from bag filter at the kiln tail comes into raw meal homogenizing silo by air chute, bucket elevator and so on.

The part of exhaust gas from cyclone filter came back into air inlet of vertical mill, and other will be discharged into atmosphere through kiln system filter, fan and chimney.
The heat air source of raw material vertical mill is from high temperature fan and preheater exhaust gas.



Start of the Pulverized Coal Vertical Mill System:

Startup: Lubrication system (Thin oil station) motor → Separator motor (frequency conversion motor) → Roller lifting → Main motor → Feeding and falling roller → Hydraulic system motor (pressurizing).


Normal Shutdown Process of Pulverized Coal Vertical Mill System:

Shutdown: Stop material command start----Feeding operation stop----Start roll lifting operation----Vertical mill main motor stop----Oil station operation stop----Hydraulic station stop



Quality Cement Clinker 85TPH 110TPH Vertical Grinding Mill for sale
Send your message to this supplier
 
*From:
*To: Henan Zhengzhou Mining Machinery CO.Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0