Sign In | Join Free | My wpc-board.com |
|
Categories | AC EV Charger |
---|---|
Brand Name: | Hongshunjin |
Model Number: | GS7-AC-B01-NK |
Certification: | CE,ROHS.FCC |
Place of Origin: | Sichuan,China |
MOQ: | 1 pieces |
Price: | $268.35-$295.15 |
Payment Terms: | T/T, L/C, D/A, D/P, MoneyGram, Western Union |
Supply Ability: | 1000 Set/Sets per Week |
Delivery Time: | 3-30 work days |
Packaging Details: | L175xW80xH55mm |
Charging Standard: | IEC 62196-2 (Type 2) |
Input voltage: | 220V AC |
Communication: | RFID/Wi-Fi/4G |
Ingress Protection: | IP66 |
RCD: | 30mA Type A+6mA DC |
Connector: | Type2 Plug |
About us
Honghsunjin Electric is a specialist in EV charging station
installations around China in multiple different scenarios.
Our products possess the top-graded materials to withstand extreme
conditions, namely being temperature-resistant, water-proof, and
dust-proof, which comply with the IP55 and IP65 certification.
We can install wall or floor-mounted EV Chargers, which are applied
in both indoor and outdoor settings, such as garages at home or
villa, carports, on-street parking and driveways.
Those charging stations can interconnect with payment systems and
back-office support through the OCPP platform for residential
management and commercial use.
Hongshunjin Electric incorporates solar PV systems or energy
storage systems into our products. Meanwhile, all EV chargers are
qualified with level II charging speed. Therefore, people can
efficiently charge their electric vehicles by using solar energy.
Note
1.Don ' t use the EVSE with an extension cord or adaptor.
2.The EVSE is only for EV charging using.
3.Don't step on, fold or knot the cable.
4.Don't touch the EVSE contact surface with heat dirt or water.
5.Don't drop the EVSE or place a heavy object on it.
6.The PE terminal of the EVSE must be reliably grounded.
product details
PEN Fault Detection
-An additional CT is installed in the PE conductor to detect any
fault current-If the fault current reaches a predetermined
threshold, all conductors are switched off.
-The load and henceforth dangerous PE are become isolated from the
supply.
Packing & Delivery
![]() |